SNOW MILL POND
THE AREA IS UNDER CONSTRUCTION
WELCOME BACK SNOW MILL POND
ALL RIGHT RESERVED (C) 2009 /2010

FIRST STAGE OF CONSTRUCTION. SAND BAGS HAVE
BEEN PLACED AROUND THE CONTROL TOWER  IN
ORDER TO DIVERSE THE WATER AWAY FROM THE
CONSTRUCTING AREA.
DATE: SEPT. 4,2009

ALL THE HEAVY EQUIPMENT HAS BEEN BROUGHT
IN. THE RIVER BELOW THE DAM HAS ALSO BEEN
SAND BAGGED IN ORDER TO CONTROL ANY
CONTAMINATED WATER. THE RETAINER  WALL
AS BEEN REMOVED ,THEY ARE PREPARING THE
AREA IN ORDER TO SET  THE FOUNDATION
 
 
 
DATE: SEPT. 20,2009

HAS BEEN POURED . THE CONTROL TOWER
DID REQUIRE A SMALL AMOUNT OF WORK,
THE FOOTING AND THE NEW RETAINER WALL
HAS BEEN POURED . THE CONTROL TOWER
DID REQUIRE A SMALL AMOUNT OF WORK,
WERE THE CONCRETE HAD BEEN DAMAGED
AND THE RE BAR  WAS EXPOSED. THE ROOF
WAS TRULY IN GOOD SHAPE DUE TO THE
FACT IT WAS METAL
DATE: DEC. 5,2009

I HAVE NOT BEEN ABLE TO CAPTURE THE
NEW VIEWING RAIL DUE TO MY ACCIDENT
IN EARLY OCTOBER AS SOON AS I AM
ABLE I WILL BE OUT THERE
DATE: SEPT. 26,2009

THE FOOTING AND THE NEW RETAINER WALL
HAS DRIED .THE FORM'S HAVE BEEN
REMOVED. THE SANDBAGS HAVE BEEN
REMOVED ,FROM THE BOTTOM OF THE DAM.
FILL WILL BE ADDED AND A LITTLE
LANDSCAPING WILL COMPLETE THIS
PROJECT.
 
WELCOME BACK SNOW MILL POND.
FEELS GREAT TO BE OUT CAPTURING WATER AGAIN